Sterling Realty Partners
Two-story gray home with broad oak and magnolia canopies, balcony, and entry stairs above a sloping lawn.

Atlanta's Tree Ordinance: Buckhead Fees and Design Review for Rebuilds

A buyer put a wooded half-acre in Buckhead under contract this spring, intending to clear part of the lot for a larger footprint. He got a bid from a tree service, budgeted for the recompense fee the crew quoted him, and closed on schedule. Then the site plan went to the City Arborist Department for permit review, and the answer that came back wasn't a bigger invoice. It was a redesign request: move the driveway, shrink the footprint, reuse the existing building pad instead of the one in the plans. None of that showed up on a fee schedule, because it wasn't a fee. It was a determination, made case by case, after the deal was already done.

Atlanta's rewritten Tree Protection Ordinance includes design review as well as fees. The City of Atlanta announced that the ordinance took effect January 1, 2026. For buyers, sellers, and investors considering Buckhead teardown properties, the design-review process is another factor to consider alongside the stated costs.

The Fee Everyone Is Quoting

Start with the number, because it matters and it's real. Atlanta News First reports that before this year, Atlanta charged a flat $100 plus $30 per diameter inch. Under the new ordinance, that base fee is gone and the per-inch rate jumped to a flat $140. A Buckhead.com report quotes Charlie Sears of Land Plus Associates calculating that recompense on a 20-inch tree went from $700 to $2,800. A homeowner clearing a modest 6-inch tree sees the same jump in proportion, from roughly $280 to $840.

For a Buckhead lot with a century of canopy on it, the arithmetic adds up fast, and it's genuinely worth budgeting for before you write an offer on a teardown property. But it's also the part of this story that's easiest to price. You can call a certified arborist, get a tree count with diameters, and know your recompense number before you sign anything.

The per-acre caps that limit how much a development project can owe also moved, and they moved by zoning classification, which matters because most of Buckhead sits in R-1 through R-5 single-family zoning:

Zoning Old per-acre cap New per-acre cap
R-1, R-2 $10,000 $35,000
R-2A, R-3, R-3A $7,500 $25,000

Fines for illegal removal, measured by acre, doubled from $100,000 to $200,000. All of this is knowable in advance. Design review, by contrast, may also affect a project's plans.

Design Review and Site Plans

The ordinance also gives the City Arborist Department authority to review design, not only the cost of tree removal. Under the new ordinance, the department has to determine whether a proposed home or addition "cannot reasonably be designed or positioned to further increase tree protection," and it can require changes to the construction plan as a condition of approval. In a Buckhead.com report, Sears said the ordinance grants "the City Arborist the authority to mandate the reuse of existing developed areas on private property," a provision that may require an existing driveway, parking area, or building footprint to be incorporated into a new plan.

The review is site-specific, and its timing may be after a buyer has committed to a purchase price, a lender has underwritten a construction budget, or a sale has closed. A fee schedule states the applicable charges; design review addresses the proposed site plan and may result in required plan changes.

How Design Review Can Affect Project Timing

For anyone buying a wooded lot in Buckhead with the intent to build bigger, the arborist's review timing is another part of project planning. If the review occurs after the due diligence period expires or after closing, a buyer may need to revise plans after committing to the purchase.

This is the piece that separates a straightforward renovation from a full teardown-and-rebuild in the current environment. According to Livable Buckhead, a homeowner pruning a hazardous limb or removing a single dead tree still has a narrower, faster permit pathway built specifically for dead, diseased, or hazardous trees, and that process hasn't gotten harder.

What This Means at the Negotiating Table

If you're selling a wooded lot. A tree inventory with diameters, done before you list, does more for a Buckhead teardown property than a fresh coat of paint. Buyers pricing a rebuild need to know their recompense exposure and whether the site is likely to trigger a design review before they can commit to a number. A seller who hands over that documentation up front removes the biggest source of buyer hesitation on a wooded parcel, and it's the kind of preparation that shows a listing was priced with the current ordinance in mind rather than last year's fee schedule.

If you're buying to build. Get the tree survey before you write the offer, not after. Confirm the property's zoning classification, since the per-acre cap on R-1 and R-2 lots is meaningfully higher than on R-2A or R-3 parcels, which changes your worst-case number. And build your due diligence period around the arborist's review timeline, not around a generic inspection window.

Frequently Asked Questions

Does this ordinance apply if I just want to remove one tree and I'm not building anything? Removing a dead, diseased, or hazardous tree still runs through a separate, faster permit pathway that the new ordinance kept in place.

Is Buckhead treated differently from the rest of Atlanta under this ordinance? Its effects concentrate in neighborhoods with the most contiguous canopy and the most R-1 through R-3 zoning, which describes most of Buckhead outside the MARTA corridors along Peachtree Road.

Will these fees change again? Yes. Starting January 1, 2027, the recompense rate adjusts annually for inflation tied to the Atlanta metro area's Consumer Price Index, so the $140-per-inch rate in place now is the floor, not a fixed number.

Buckhead's canopy is part of what makes the neighborhood worth buying into, and the new ordinance is built to keep it that way. The ordinance's fees are one part of planning a lot for a rebuild; design review is another. If you're pricing a lot for a rebuild, or listing one, consider both the applicable fees and the potential effects of design review. Talk to Sterling Realty Partners before you write that offer, and we'll help you price the whole picture, not just the recompense line. Schedule Your Consultation.

This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.

Work With Us

As a full-service commercial and residential team we pride ourselves in finding solutions that will meet our client’s objectives within various areas of real estate.

Follow Me on Instagram